|
The group has three mines allocated to them: 1. Roida Mines at Barbil
allotted to MISL. This is a private mine, the products of which can be sold in
the open market and is not linked to any captive consumption. |
|
|
2. Malangtoli Mines located around 50 Kms away from Roida mines is allotted to
MESCO Steel Ltd. This is a captive mine for the steel plants of MESCO Group and
for supply of ore to other steel manufacturers in the Dubri region, i.e the place
where MISL plant is located. |
|
|
3. Kalinga Mines is allotted to MESCO Kalinga Ltd. for captive use for manufacture of steel. |
|
Of the above three mines only Roida mines is now in operation and the Malangtoli
mines is proposed to be put into operation to coincide with the 3 million tonne
plant of MISL. The mine is operated by fully mechanized opencast method of working.
Presently the mine is operating at an annual capacity of 3 million tones & plans
to expand further to 5 million tonnes. Operations at Roida mines are fully
mechanized, the company has put following equipment at mines:
- 100 TPH Crusher – 1 No. - 200 TPH Crusher – 1 No.
|
|
In addition to above the company has
taken 2 crushers from outside parties on contract, which are exclusively used
for MISL production. - Power Screens | | 3Nos. - Excavator
| 2Cu.M | 6Nos.
- Tippers/Dumpers | 25Tfor 200TPH
| 15Nos. - Drill
| 100mm Dia |
3Nos. - Dozer
| 165HP | 2Nos.
- Compressor | 450CFM
| Adequate Nos. - Pneumatic Drills | | Adequate Nos. - Water Sprinkler/ Tanker
| |
3Nos. - Pay Loader | 2.5Cu.M | 3Nos. - T ools & Tackles|
| Adequate Nos. |
|
Maintenance There are 4-5 rail heads within a distance of around 15 - 30 Km
of Roida Iron Ore Mines. The company is moving material through trucks to the rail
heads for onward transportation by rail. Roida Iron ore mines is well connected
with state highways, the company is moving its material through rail as well road. |
|